| 1916 |
Electric Steel Manufacturing Co.,
Ltd. was established.
Production of alloy and tool steels started. |
 |
| 1921 |
Steel division of Daido Electric
Power Co., Ltd. separated to form
Daido Steel Co., Ltd. |
 |
| 1937 |
Hoshizaki plant began operation.
|
 |
| 1941 |
R & D division was established. |
 |
| 1963 |
Chita plant began operation. |
 |
| 1965 |
The first U.S. office was opened. |
 |
| 1976 |
Merged with Japan Special Steel and
Tokushu Seiko. |
 |
| 1988 |
The American Society for Metals
designated the 1.5 ton Herout type
electric arc furnace(1916), our company treasure,
an ASM Historical
Landmark. (Exhibited in Chita Plant) |
 |
| 1992 |
Large section, vertical continuous
caster began operation at Chita
Plant for the first time in Japan. |
 |
| 1993 |
Beijing Information center was
opened. |
 |
| 1995 |
Hong Kong office was opened. |
 |
| 1997 |
Bangkok office was opened. |
 |
| 2001 |
Steckel mill was introduced into
Hoshizaki Plant. Production of
high-grade strip steel started with the integrated
manufacturing
process. |
An efficient steel melting process
was developed by introducing
two 700-ton molten steel storage vessels. We call
this process as
"AN (Anticipate the Next) process". |
 |
| 2002 |
The steel casting divisions of Daido
Steel Co., Ltd. , Daido Special
Castings Co., Ltd. , and Daido Precision Parts
Co., Ltd. were united to
form a world class integrated maker of steel
castings,
"Daido Castings Co., Ltd.", established
in April 2002. |
The accumulated quantify of blooming
at Chita Plant since its
startup reached 50 million tons. |
 |
| 2004 |
Shanghai office was opened. |
 |
| 2005 |
Guangzhou office was opened. |